Descrizione Progetto

In the area of wind tunnel testing, the experimental equipment developed in the course of the last years has now reached full maturity and complete operational capabilities. Major milestones have been represented by experiments successfully conducted with two machines in wake interference conditions with the  rotor operating in the wake of the first one designed with aeroelastically-scaled blades equipped with bending-torsion coupling for load alleviation and also with individual blade pitch control.